What is the installation sequence of Window and Door Profile?

Publish Time: 2021-08-12     Origin: Site

What is the installation sequence of Window and Door Profile? Plastic steel profiles have the following sharing.


The installation process is: elastic thread finding rules → initial installation → calibration → fixing → filling with mineral wool → glueing → hardware and window sash installation


1. Finding the gauge is short:


Find the edge of the window at the upper level, draw the edge of the window down with a large line drop, and mark the window at each level, and pick up the individual non-straight edges.


2. Placement and temporary fixation:


Install it according to the already placed installation position line, and hang it upright to straighten it. After there is no problem, it can be temporarily fixed with a wooden.


3. Use a nail gun to fix the iron feet with the wall. The distance between the iron feet and the corner of the window should not be greater than 200m, and the distance between the iron feet should be less than 550-650mm. The hollow bricks of the fixed wall must be filled with C20 fine stone concrete.


4. Deal with the gap between the window frame and the wall


After the window is fixed, the gap should be filled in layers with mineral wool in time, and the outer surface should be filled with caulking paste with a depth of 5-8mm. Cement mortar should not be used for filling. After the plastic-steel window is installed, fill in the gaps around the window frame at the same time, and the filling force should not be too large to prevent the window frame from deforming after being stressed.


5. Install hardware accessories and window sashes:


After the sizing work is completed, the hardware of the window can be installed according to the product instructions after the oil painting is completed, and the installation is required to be firm and flexible in use. The window sash installation is to be carried out before the completion of the project.


CONTACT
Add:Fenghuangshan Industry Zone,Puji Town,Zhangqiu District  JINAN,CHINA
Tel:+86-0531-83873666
Fax:+86-0531-83828518
Ph:+86-186 6966 9908
LEAVE A MESSAGE

Copyright © Jinan Lumei Construction Material Co.,Ltd All Rights Reserved.